Our Projects
- Home
- Our Projects
EXPLORE WORK
The great work we did
Scaffolding Works for N2 Line Works at Vopak Horizon
Scaffolding Works for N2 Line Works at Vopak Horizon
Nature of works : Scaffolding
Main Contractor : Hiap Seng Engineering Limited
Client : Vopak Horizon Fujairah Limited
Contract period : July 2018 – August 2018
![Scaffolding Works for N2 Line Works at Vopak Horizon](http://abcengllc.com/wp-content/uploads/2020/07/vopak-horizon-abc-eng-llc-project.jpg)
Scaffolding Works for EOT Crane Repair in MM at IPTF
Scaffolding Works for EOT Crane Repair in MM at IPTF
Nature of works : Scaffolding
Client : IL&FS Prime Terminals FZC (IPTF)
Contract period : July 2018
![Scaffolding Works for EOT Crane Repair in MM at IPTF](http://abcengllc.com/wp-content/uploads/2020/07/Scaffolding-Works.jpg)
Scaffolding Works for Shut Down Job at VTTI
Scaffolding Works for Shut Down Job at VTTI
Nature of works : Scaffolding
Main Contractor : Hiap Seng Engineering Limited
Client : VTTI
Contract period : May 2018 – July 2018
![Scaffolding Works for Shut Down Job at VTTI](http://abcengllc.com/wp-content/uploads/2020/07/SCAFFOLDING-WORK-ABC-ENG-LLC.jpg)
Access Scaffolding Work for Work Shop Facility Installation at Rotary Engineering
Access Scaffolding Work for Work Shop Facility Installation at
Rotary Engineering
Nature of works : Insulation
Client : Rotary Engineering Fujairah FZE
Contract period : February 2018 – May 2018
![Access Scaffolding Work for Work Shop Facility Installation at Rotary Engineering](http://abcengllc.com/wp-content/uploads/2020/07/ROTARY-ABC-ENG-LLC-PROJECT.jpg)
Roofing & Insulation Work for Work Shop Facility Installation at Rotary Engineering
Roofing & Insulation Work for Work Shop Facility Installation
at Rotary Engineering
Nature of works : Insulation
Client : Rotary Engineering Fujairah FZE
Contract period : February 2018 – May 2018
![Roofing & Insulation Work for Work Shop Facility Installation at Rotary Engineering](http://abcengllc.com/wp-content/uploads/2020/07/insulation-3-abc.jpg)
Fresh Water Line Installation Work for Vopak Horizon
Fresh Water Line Installation Work for Vopak Horizon
Nature of works : Insulation
Main Contractor : Adyard Abu Dhabi LLC
Client : Vopak Horizon Fujairah Limited
Contract period : January 2018 – March 2018
![Fresh Water Line Installation Work for Vopak Horizon](http://abcengllc.com/wp-content/uploads/2020/07/insulation-2-abc.jpg)
Insulation Work for Fujairah Rockwool Factory (FRF)
Insulation Work for Fujairah Rockwool Factory (FRF)
Nature of works : Insulation
Main Contractor : Albanna Engineering
Client : Fujairah Rockwool Factory
Contract period : June 2018 – July 2018
![Insulation Work for Fujairah Rockwool Factory (FRF)](http://abcengllc.com/wp-content/uploads/2020/07/insulation-1-abc.jpg)
Shut Down Works for Berth 2,3,4,5 & 6 at Vopak Horizon
Shut Down Works for Berth 2,3,4,5 & 6 at Vopak Horizon
Nature of works : Maintenance
Client : Vopak Horizon Fujairah Limited
Contract period : December 2018
![Shut Down Works for Berth 2,3,4,5 & 6 at Vopak Horizon](http://abcengllc.com/wp-content/uploads/2020/07/vopak-horizon-abc-eng-llc-project.jpg)
Black Tank Conversion Work at Vopak Horizon
Black Tank Conversion Work at Vopak Horizon
Nature of works : Scaffolding inside tank
Client : Vopak Horizon Fujairah Limited
Contract period : September 2018
![Black Tank Conversion Work at Vopak Horizon](http://abcengllc.com/wp-content/uploads/2020/07/Scaffold-inside-tank-abc-eng-llc.jpg)
Scaffolding Installation & Dismantling work for Ecomar
Pipeline Erection Inside POF
Nature of works : Scaffolding
Main Contractor : Sunshine Engineering Works
Client : Ecomar Energy Solutions
Contract period : January 2019 – February 2019
![Scaffolding Installation & Dismantling work for Ecomar](http://abcengllc.com/wp-content/uploads/2020/07/ecomar-abc-eng-llc-project.jpg)
Insulation Repairing Works at GTI
Nature of works : Insulation Repairing works
Client : GTI Fujairah FZC
Contract period : June 2019
![Insulation Repairing Works at GTI](http://abcengllc.com/wp-content/uploads/2019/08/project8-1.jpg)
VOPAK Annual Maintenance Contract
Vopak Annual Maintenance Contract 2018
Nature of works : Scaffolding
Client : Vopak Horizon Fujairah Limited
Contract period : One year (January – December)
![VOPAK Annual Maintenance Contract](http://abcengllc.com/wp-content/uploads/2020/07/vopak-horizon-abc-eng-llc-project.jpg)
Scaffolding for Dolphin Repairing Works
Nature of works : Scaffolding
Client : Vopak Horizon Fujairah Limited
Contract period : November 2019
![Scaffolding for Dolphin Repairing Works](http://abcengllc.com/wp-content/uploads/2019/08/project7-1.jpg)
Scaffolding Work for Marine Loading Arm Repairing Works
Nature of works : Scaffolding
Client : Vopak Horizon Fujairah Limited
Contract period : November 2019
![Scaffolding Work for Marine Loading Arm Repairing Works](http://abcengllc.com/wp-content/uploads/2019/08/Marine-loading-arm-repairing-works.jpg)
AC Duct Repairing Work inside POF
Nature of works : Insulation
Client : Port of Fujairah
Contract period : May 2019
![AC Duct Repairing Work inside POF](http://abcengllc.com/wp-content/uploads/2019/08/project12-1.jpg)
Equipment Insulation Job at Ecomar
Equipment Insulation Job at Ecomar
Nature of works : Insulation
Main Contractor : Sunshine Engineering Works
Client : Ecomar Energy Solutions
Contract period : January 2019 – February 2019
![Equipment Insulation Job at Ecomar](http://abcengllc.com/wp-content/uploads/2019/08/project13-1.jpg)
EHT & Insulation Work inside MM1, Fujairah Oil Tanker
Terminals (FOTT)
Nature of works : Insulation
Main Contractor : Audex Fujairah LL FZE
Client : Port of Fujairah
Contract period : July 2018 – October 2018
![EHT & Insulation Work inside MM1, Fujairah Oil Tanker](http://abcengllc.com/wp-content/uploads/2020/07/insulation-abcengllc-10.jpg)
Fire Pump House Insulation at Fujairah Oil Terminal FZC (FOT)
Nature of works : Insulation
Client : FOT
Contract period : February 2018 – May 2018
![Fire Pump House Insulation at Fujairah Oil Terminal FZC (FOT)](http://abcengllc.com/wp-content/uploads/2020/07/insulation-abcengllc-11.jpg)
Insulation Work inside FOTT
Nature of works : Insulation
Main Contractor : Audex Fujairah LL FZE
Client : Port of Fujairah
Contract period : July 2018 – October 2018
![Insulation Work inside FOTT](http://abcengllc.com/wp-content/uploads/2019/08/project4-1.jpg)
EHT & Insulation at GPC
EHT & Insulation at GPC
Nature of works : Insulation and cladding
Main Contractor : SST Thermal Solutions
Client : Gulf Petrochem Oil Terminal (GPC)
Contract period : October 2019
![EHT & Insulation at GPC](http://abcengllc.com/wp-content/uploads/2019/08/insulation.jpg)
Insulation Work for Fujairah Rockwool Factory (FRF)
Nature of works : Insulation
Main Contractor : Albanna Engineering
Client : Fujairah Rockwool Factory
Contract period : June 2018 – July 2018
![Insulation Work for Fujairah Rockwool Factory (FRF)](http://abcengllc.com/wp-content/uploads/2020/07/insulation-4abc.jpg)
Industry Complex
Nature of works : Scaffolding
Main Contractor : Socar Aurora Fujairah Limited
Client : Global Terminal Investments (GTI)
Contract period : March 2018 – June 2018
![Industry Complex](http://abcengllc.com/wp-content/uploads/2020/07/scaffolding-abc-eng-llc-1.jpg)